dpow
Ashgrove Vance Construction Client hub
Interactive demo, sample data. Every company, person, project and drawing here is fictional.

Good morning, Sam

Ashgrove Vance Construction · every package your subcontractors share with you · as of Saturday 3 October 2026

See how a subcontractor shares a package
Live projects415 packages shared
Subcontractors on dpow7sharing with you
Design complete64%of all package deliverables
Packages at risk or behind5of 15
Overdue RFIs1268 open in total
Reports on time11/15last weekly report
Over capacity2subcontractors, next 8 weeks
CI

Corvane Interiors

Drylining and ceilings · 3 jobs with you · 0 overdue RFIs · reports on time 3/3

80%Peak load 102%
CIEC2 Office Fit-OutCopperworks Estates · Drylining, partitions and ceilings72%46/64drawings4RFIs openMon 28 Seplast reportNext: 12 OctLevel 3 to 5 partition set at S4On trackOpen →CIDocklands Lobby RefurbishmentRavelstone Holdings · Drylining and feature ceilings41%12/29drawings2RFIs openMon 28 Seplast reportNext: 21 OctFeature ceiling setting outOn trackOpen →CILarkfield Harbour HotelLarkfield Hospitality · Bedroom and corridor partitions93%118/127drawings1RFIs openMon 28 Seplast reportNext: 30 OctAs-built drawings, floors 1 to 4On trackOpen →
HR

Halden Rowe Architects

Architecture (novated) · 2 jobs with you · 1 overdue RFI · reports on time 2/2

63%Peak load 81%
HREC2 Office Fit-OutCopperworks Estates · Architecture, Stage 481%162/200drawings6RFIs, 1 overdueFri 2 Octlast reportNext: 9 OctReception joinery details for approvalOn trackOpen →HRRiverside Labs ConversionTamsin Quay Developments · Architecture, Stage 338%54/142drawings8RFIs openFri 2 Octlast reportNext: 30 OctStage 3 report and coordinated GA setOn trackOpen →
TJ

Tessaly Joinery

Bespoke joinery · 2 jobs with you · 2 overdue RFIs · reports on time 1/2

74%Peak load 78%
TJEC2 Office Fit-OutCopperworks Estates · Reception and tea point joinery48%11/23drawings5RFIs, 2 overdueMon 21 Sepreport lateNext: 16 OctReception desk shop drawingsAt riskOpen →TJLarkfield Harbour HotelLarkfield Hospitality · Bedroom joinery packs87%41/47drawings2RFIs openFri 2 Octlast reportNext: 12 OctWardrobe and desk manufacturing releaseOn trackOpen →
BF

Brightwell Façades

Curtain walling and façades · 2 jobs with you · 3 overdue RFIs · reports on time 1/2

26%Peak load 82%
BFDocklands Lobby RefurbishmentRavelstone Holdings · Entrance glazing and canopy35%6/17drawings6RFIs, 3 overdueMon 14 Sepreport lateNext: 9 OctCanopy structural calculationsBehindOpen →BFRiverside Labs ConversionTamsin Quay Developments · Façade retention and recladding22%8/36drawings4RFIs openMon 28 Seplast reportNext: 6 NovFaçade survey and retention strategyOn trackOpen →
KB

Kinloss Building Services

Mechanical and electrical · 2 jobs with you · 3 overdue RFIs · reports on time 1/2

53%Peak load 108%
KBEC2 Office Fit-OutCopperworks Estates · Mechanical and electrical66%88/133drawings9RFIs, 1 overdueFri 2 Octlast reportNext: 19 OctLevel 4 coordinated servicesOn trackOpen →KBRiverside Labs ConversionTamsin Quay Developments · Laboratory services strategy29%21/72drawings11RFIs, 2 overdueFri 25 Sepreport lateNext: 16 OctFume cupboard extract strategyAt riskOpen →
OF

Oriel Fire Protection

Fire stopping and doors · 2 jobs with you · 3 overdue RFIs · reports on time 1/2

69%Peak load 90%
OFEC2 Office Fit-OutCopperworks Estates · Fire stopping and fire doors58%14/24drawings3RFIs, 1 overdueMon 28 Seplast reportNext: 14 OctFire door schedule at S4At riskOpen →OFLarkfield Harbour HotelLarkfield Hospitality · Fire stopping, all floors76%31/41drawings4RFIs, 2 overdueMon 21 Sepreport lateNext: 7 OctPenetration seal schedule, floors 5 to 8BehindOpen →
PF

Penhallow Flooring

Raised floors and finishes · 2 jobs with you · 0 overdue RFIs · reports on time 2/2

65%Peak load 76%
PFDocklands Lobby RefurbishmentRavelstone Holdings · Stone and raised floors55%9/16drawings1RFIs openFri 2 Octlast reportNext: 23 OctStone setting-out drawingsOn trackOpen →PFLarkfield Harbour HotelLarkfield Hospitality · Bathroom and lobby flooring69%22/32drawings2RFIs openMon 28 Seplast reportNext: 15 OctLobby stone samples approvalOn trackOpen →