Good morning, Sam

Ashgrove Vance Construction · every package your subcontractors share with you · as of Saturday 3 October 2026

See how a subcontractor shares a package
Live projects415 packages shared
Subcontractors on dpow7sharing with you
Design complete64%of all package deliverables
Packages at risk or behind5of 15
Overdue RFIs1268 open in total
Reports on time11/15last weekly report
Over capacity2subcontractors, next 8 weeks

EC2 Office Fit-Out

Copperworks Estates · London EC2 · RIBA Stage 4, Technical Design · £14.2M

72%5 packages
CICorvane InteriorsDrylining, partitions and ceilings72%46/64drawings4RFIs openMon 28 Seplast reportNext: 12 OctLevel 3 to 5 partition set at S4On trackOpen →HRHalden Rowe ArchitectsArchitecture, Stage 481%162/200drawings6RFIs, 1 overdueFri 2 Octlast reportNext: 9 OctReception joinery details for approvalOn trackOpen →TJTessaly JoineryReception and tea point joinery48%11/23drawings5RFIs, 2 overdueMon 21 Sepreport lateNext: 16 OctReception desk shop drawingsAt riskOpen →KBKinloss Building ServicesMechanical and electrical66%88/133drawings9RFIs, 1 overdueFri 2 Octlast reportNext: 19 OctLevel 4 coordinated servicesOn trackOpen →OFOriel Fire ProtectionFire stopping and fire doors58%14/24drawings3RFIs, 1 overdueMon 28 Seplast reportNext: 14 OctFire door schedule at S4At riskOpen →

Docklands Lobby Refurbishment

Ravelstone Holdings · London E14 · RIBA Stage 4, Technical Design · £6.1M

44%3 packages
CICorvane InteriorsDrylining and feature ceilings41%12/29drawings2RFIs openMon 28 Seplast reportNext: 21 OctFeature ceiling setting outOn trackOpen →BFBrightwell FaçadesEntrance glazing and canopy35%6/17drawings6RFIs, 3 overdueMon 14 Sepreport lateNext: 9 OctCanopy structural calculationsBehindOpen →PFPenhallow FlooringStone and raised floors55%9/16drawings1RFIs openFri 2 Octlast reportNext: 23 OctStone setting-out drawingsOn trackOpen →

Riverside Labs Conversion

Tamsin Quay Developments · Reading · RIBA Stage 3, Spatial Coordination · £22.8M

33%3 packages
HRHalden Rowe ArchitectsArchitecture, Stage 338%54/142drawings8RFIs openFri 2 Octlast reportNext: 30 OctStage 3 report and coordinated GA setOn trackOpen →KBKinloss Building ServicesLaboratory services strategy29%21/72drawings11RFIs, 2 overdueFri 25 Sepreport lateNext: 16 OctFume cupboard extract strategyAt riskOpen →BFBrightwell FaçadesFaçade retention and recladding22%8/36drawings4RFIs openMon 28 Seplast reportNext: 6 NovFaçade survey and retention strategyOn trackOpen →

Larkfield Harbour Hotel

Larkfield Hospitality · Southampton · RIBA Stage 5, Manufacturing and Construction · £31.5M

86%4 packages
CICorvane InteriorsBedroom and corridor partitions93%118/127drawings1RFIs openMon 28 Seplast reportNext: 30 OctAs-built drawings, floors 1 to 4On trackOpen →TJTessaly JoineryBedroom joinery packs87%41/47drawings2RFIs openFri 2 Octlast reportNext: 12 OctWardrobe and desk manufacturing releaseOn trackOpen →OFOriel Fire ProtectionFire stopping, all floors76%31/41drawings4RFIs, 2 overdueMon 21 Sepreport lateNext: 7 OctPenetration seal schedule, floors 5 to 8BehindOpen →PFPenhallow FlooringBathroom and lobby flooring69%22/32drawings2RFIs openMon 28 Seplast reportNext: 15 OctLobby stone samples approvalOn trackOpen →